ETTER LN over CANE RUN CREEK

.5 MI W OF JCT US 25 · County 209, Kentucky · Built 1975 · 2 Lanes · 740 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
105C00033N
Year Built
1975
Length
19.8 m (65 ft)
Max Span
18.4 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
740
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$173,000
Total Project Cost
$173,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.