I-75 South over NS (CNO&TP) SYSTEM

.09 MI.S JCT KY 620 NBL · County 209, Kentucky · Built 1994 · 3 Lanes · 25,877 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
105B00121L
Year Built
1994
Length
94.2 m (309.1 ft)
Max Span
38.1 m
Width
20 m (65.6 ft)
Lanes
3
Daily Traffic
25,877
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,443,000
Total Project Cost
$6,443,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.