SB I-75 over E MAIN ST EXT

.9 MI S -US 460 @ GTOWN · County 209, Kentucky · Built 1992 · 3 Lanes · 31,655 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
105B00119L
Year Built
1992
Length
17.1 m (56.1 ft)
Max Span
15.2 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
31,655
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$440,000
Total Project Cost
$440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.