I-75 over LAMBERT ROAD

2.1 MI SOU. OF MADISON CL · County 203, Kentucky · Built 1967 · 6 Lanes · 47,638 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
102B00042N
Year Built
1967
Length
6.9 m (22.6 ft)
Max Span
6.2 m
Lanes
6
Daily Traffic
47,638
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$58,000
Total Project Cost
$57,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.