US-23 NC over SB US-23 On-Ramp

US 23/KY 1426 Interchange · County 195, Kentucky · Built 1988 · 2 Lanes · 13,416 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
098B00183L
Year Built
1988
Length
65.5 m (214.9 ft)
Max Span
22.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
13,416
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,075,000
Total Project Cost
$1,075,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.