RIGHT FORK BUFFALO over HARRISON BRANCH

3.2 MI-S.JCT KY 2024 · County 189, Kentucky · Built 1996 · 1 Lanes · 41 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
095C00029N
Year Built
1996
Length
6.7 m (22 ft)
Max Span
6.4 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
41
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.