I-71 NB over KY 329

3.0 MI S OF KY 146 · County 185, Kentucky · Built 1968 · 2 Lanes · 20,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
093B00030R
Year Built
1968
Length
49.4 m (162.1 ft)
Max Span
20.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
20,700
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.