SIMPSON LANE over CALLOWAY CREEK

1.1MI N-JCT I-75 · County 151, Kentucky · Built 1978 · 2 Lanes · 507 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
076C00048N
Year Built
1978
Length
8.4 m (27.6 ft)
Max Span
2.8 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
507
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$75,000
Total Project Cost
$75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.