I-75 over KY 595

1.8 MI NORTH JCT KY 21 · County 151, Kentucky · Built 2003 · 6 Lanes · 64,079 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
076B00104N
Year Built
2003
Length
53.3 m (174.9 ft)
Max Span
27.4 m
Width
38.9 m (127.6 ft)
Lanes
6
Daily Traffic
64,079
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.