Tower Mountain Rd over Beech Fork

50 FT W of US 421 · County 131, Kentucky · Built 2020 · 1 Lanes · 24 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
066C00098N
Year Built
2020
Length
20 m (65.6 ft)
Max Span
19.5 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
24
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.