I-75 RAMP over 9TH ST (COV)

PIKE ST TO I75NB OVR 9TH · County 117, Kentucky · Built 1993 · 1 Lanes · 159,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
059B00089N
Year Built
1993
Length
48.5 m (159.1 ft)
Max Span
16.2 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
159,350
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$582,000
Total Project Cost
$582,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.