KY-40 over Levisa Fork

0.1 MI E of JCT KY 581 · County 115, Kentucky · Built 1958 · 2 Lanes · 7,395 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
058B00004N
Year Built
1958
Length
176.4 m (578.7 ft)
Max Span
64 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
7,395
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,316,000
Total Project Cost
$2,316,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.