I-65 SB OFF RAMP over I-65 NB OFF RAMP

AT I-264 I-65S TO I-265W · County 111, Kentucky · Built 1988 · 1 Lanes · 129,829 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
056B00398N
Year Built
1988
Length
34.4 m (112.9 ft)
Max Span
32.3 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
129,829
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$428,000
Total Project Cost
$427,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.