I-71 SB over ZORN AVE

3.3 MI S OF I-264 · County 111, Kentucky · Built 1967 · 2 Lanes · 26,731 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
056B00167L
Year Built
1967
Length
83.7 m (274.6 ft)
Max Span
36.6 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
26,731
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,080,000
Total Project Cost
$1,080,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.