Ramp M over I-69

1 mi N of JCT US 41 · County 107, Kentucky · Built 2014 · 2 Lanes · 20,310 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
054B00225N
Year Built
2014
Length
151.1 m (495.7 ft)
Max Span
39.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
20,310
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.