INDUSTRIAL PARKWAY over HORN HOLLOW ROAD

2.246 MI S OF JCT US 23 · County 089, Kentucky · Built 2003 · 2 Lanes · 4,198 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
045B00084N
Year Built
2003
Length
153 m (502 ft)
Max Span
32 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
4,198
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.