BATON ROUGE RD. over I-75 @ 156.647 MM

.4 MI W OF JCT US 25 · County 081, Kentucky · Built 2005 · 2 Lanes · 399 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
041B00070N
Year Built
2005
Length
79.7 m (261.5 ft)
Max Span
20.4 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
399
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.