KY 2937 HEEKIN RD over I-75

I-75 NB SB 152.02 MM · County 081, Kentucky · Built 2006 · 2 Lanes · 434 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
041B00061N
Year Built
2006
Length
78.3 m (256.9 ft)
Max Span
37.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
434
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.