KY-2942 over I-75 @ 164.193

.1 MI W OF JCT US 25 · County 081, Kentucky · Built 2002 · 2 Lanes · 4,943 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
041B00051N
Year Built
2002
Length
100.8 m (330.7 ft)
Max Span
32.8 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
4,943
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.