E I-64 over ROYSTER ROAD

2.1 MI. E. JCT I-64&I-75 · County 067, Kentucky · Built 1998 · 3 Lanes · 20,096 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
034B00152R
Year Built
1998
Length
52.6 m (172.6 ft)
Max Span
20 m
Width
19.7 m (64.6 ft)
Lanes
3
Daily Traffic
20,096
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,393,000
Total Project Cost
$1,392,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.