W NEW CIRCLE RD OL over TATES CRK ROAD KY 1974

EBL OVR KY 1974 INTERCHAN · County 067, Kentucky · Built 1969 · 2 Lanes · 32,879 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
034B00028L
Year Built
1969
Length
56.7 m (186 ft)
Max Span
16.3 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
32,879
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$756,000
Total Project Cost
$755,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.