US-60 over STONER CREEK

0.5 MI E OF I-64 OVRPAS · County 049, Kentucky · Built 1995 · 2 Lanes · 6,197 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
025B00100N
Year Built
1995
Length
26.2 m (86 ft)
Max Span
24.9 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
6,197
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.