US-68 over CHAPLIN RIVER

East 150/68 JCT · County 021, Kentucky · Built 1934 · 2 Lanes · 1,379 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
011B00042N
Year Built
1934
Reconstructed
2022
Length
29.4 m (96.5 ft)
Max Span
10.4 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
1,379
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$437,000
Total Project Cost
$436,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.