I-64 EAST over KY 180

EBL OVER KY180 INTERCHANG · County 019, Kentucky · Built 2007 · 2 Lanes · 10,230 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
010B00073R
Year Built
2007
Length
77.2 m (253.3 ft)
Max Span
39.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
10,230
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.