I-75 NC over KY 536 (MT ZION RD)

1.8 MI S JCT US 42 SBL · County 015, Kentucky · Built 1992 · 4 Lanes · 70,784 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
008B00080L
Year Built
1992
Length
48.5 m (159.1 ft)
Max Span
16.2 m
Width
23 m (75.5 ft)
Lanes
4
Daily Traffic
70,784
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,503,000
Total Project Cost
$1,502,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.