I-71 NC over I-75

SBL OVER I-75 INTERCHANGE · County 015, Kentucky · Built 1967 · 1 Lanes · 20,852 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
008B00042L
Year Built
1967
Length
93.6 m (307.1 ft)
Max Span
25 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
20,852
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,009,000
Total Project Cost
$1,009,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.