KY-551 over TRIB OF CASEY CREEK

0.64 MI. S KY 1742 · County 001, Kentucky · Built 1935 · 2 Lanes · 278 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
001B00075N
Year Built
1935
Length
7 m (23 ft)
Max Span
3.4 m
Lanes
2
Daily Traffic
278
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$78,000
Total Project Cost
$128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.