TRAIL Z81 & Z85 over TIMBER CREEK

765-510 · County 161, Kansas · Built 1923 · 2 Lanes · 5 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPFORRIL000901
Year Built
1923
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
5
Material
Concrete
Design
Tee Beam
Owner
Other
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.