CUSTER ROAD over PUMP HOUSE CANYON

905-258 · County 061, Kansas · Built 2019 · 3 Lanes · 1,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
DAPFORRIL000204
Year Built
2019
Length
10.4 m (34.1 ft)
Max Span
4.9 m
Width
23.5 m (77.1 ft)
Lanes
3
Daily Traffic
1,000
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.