K-254 HWY EB over UNION PACIFIC RAILROAD

9.65 MI E OF SEDWICK CL · County 015, Kansas · Built 1998 · 2 Lanes · 6,156 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
999925400081661
Year Built
1998
Length
66.6 m (218.5 ft)
Max Span
21.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
6,156
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.