US-160 HWY over CANEY RIVER DRAINAGE

7.71 MI E OF COWLEY CO. · County 049, Kansas · Built 2004 · 2 Lanes · 780 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
999916000250391
Year Built
2004
Length
6.6 m (21.7 ft)
Max Span
3.1 m
Width
23.4 m (76.8 ft)
Lanes
2
Daily Traffic
780
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.