K-148 HWY over COAL CREEK DRAINAGE

5.70 MI E OF US-81 · County 157, Kansas · Built 2015 · 2 Lanes · 246 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
999914800790731
Year Built
2015
Length
7.5 m (24.6 ft)
Max Span
3.7 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
246
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.