I135 HWY NB over OKT RR HYDRAULIC AVE

1.19 MI N 21ST ST NB · County 173, Kansas · Built 1970 · 3 Lanes · 36,128 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
999913500870271
Year Built
1970
Reconstructed
2002
Length
145.9 m (478.7 ft)
Max Span
25.3 m
Width
20.8 m (68.2 ft)
Lanes
3
Daily Traffic
36,128
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.