US-75 HWY NB over TOPEKA AVENUE

2.54 MI N OSAGE COLN NB · County 177, Kansas · Built 1998 · 2 Lanes · 4,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
999907500892071
Year Built
1998
Length
124.8 m (409.4 ft)
Max Span
35.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
4,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.