I70 HWY EB-WB over BIG CREEK DRAINAGE

4.55 MI E JT U183 · County 051, Kansas · Built 1965 · 5 Lanes · 8,367 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
999907000260251
Year Built
1965
Length
11.4 m (37.4 ft)
Max Span
3.7 m
Width
45.6 m (149.6 ft)
Lanes
5
Daily Traffic
8,367
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.