K-47 HWY over NEOSHO RIVER DRAINAGE

4.13 MI E US-59 · County 133, Kansas · Built 1992 · 2 Lanes · 1,929 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
999904700670821
Year Built
1992
Length
60.5 m (198.5 ft)
Max Span
17.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
1,929
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.