K-42 HWY over CHIKASKIA RIVER DRG

7.62 MI W K14 · County 095, Kansas · Built 2023 · 2 Lanes · 416 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
999904200481171
Year Built
2023
Length
54.9 m (180.1 ft)
Max Span
21.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
416
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.