US36 HWY over DEER CREEK DRAINAGE

6.93MI E NORTON CO LINE · County 147, Kansas · Built 1961 · 2 Lanes · 1,473 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
999903600740031
Year Built
1961
Length
57.8 m (189.6 ft)
Max Span
23.5 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
1,473
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.