13th Street over Stream

100E 13/Bluestem Int · County 045, Kansas · Built 1996 · 2 Lanes · 80 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
508750230000002
Year Built
1996
Length
7.9 m (25.9 ft)
Max Span
2.2 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
80
Material
Steel
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$240,000
Total Project Cost
$280,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.