FIRST ST. over TRIB. TO DRY TURKEY CK.

400 FT. E. OF NORTH HIGH · County 113, Kansas · Built 2020 · 4 Lanes · 9,100 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
417450594006523
Year Built
2020
Length
13 m (42.7 ft)
Max Span
3 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
9,100
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.