30 E over SOUTH FORK SOLOMON RIVER
3.3S 3.0E OF HOXIE · County 179, Kansas · Built 1967 · 2 Lanes · 30 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
39.310292, -100.386364
This bridge is in worse condition than 89.7% of bridges in County 179. The average bridge in Kansas is 0 years old; this one is 59 years old.
Nearby Bridges
50 E over SOUTH FORK SOLOMON RIVER
Built 1955
K23 HWY over SOUTH FK SOLOMON RIVER
Built 1940
10 E over SAND CREEK
Built 1999
50 E over SAND CREEK
Built 1998
20 S over SOUTH FORK SOLOMON RIVER
Built 1997
US24 HWY over SAND CREEK DRAINAGE
Built 1952
US24 HWY over SAND CREEK DRAINAGE
Built 1952
K23 HWY over SAND CREEK
Built 1940
60 E over SAND CREEK
Built 1955
US24 HWY over SAND CREEK DRAINAGE
Built 1952
Bridge Details
- Structure #
- 000900493003947
- Year Built
- 1967
- Length
- 21.9 m (71.9 ft)
- Max Span
- 5.2 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $300,000
- Total Project Cost
- $450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.