URISH RD. 280 over TRIB. TO SIX MILE CREEK

3.3N 2.0E OF AUBURN · County 177, Kansas · Built 1974 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000890987004427
Year Built
1974
Length
10.7 m (35.1 ft)
Max Span
10.4 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.