4th N over TRIB. TO SPRING CREEK

2.4E 4.0N OF CHENEY · County 173, Kansas · Built 1997 · 2 Lanes · 50 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000870777406180
Year Built
1997
Length
13.1 m (43 ft)
Max Span
4.2 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.