LOCAL 474-811.1 over GYPSUM CREEK

2.5N 0.2E OF GYPSUM · County 169, Kansas · Built 2022 · 2 Lanes · 58 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000850811104740
Year Built
2022
Length
49.8 m (163.4 ft)
Max Span
19.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
58
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.