CR 230 over UNNAMED STREAM

0.6S 2.0W OF RUSH CENTER · County 165, Kansas · Built 1974 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000830603005126
Year Built
1974
Length
8.5 m (27.9 ft)
Max Span
8.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
30
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.