FOUNTAIN GR 32.10 over DRAIN
3.5E 2.0S OF CASTLETON · County 155, Kansas · Built 1964 · 2 Lanes · 2 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
37.839575, -97.902667
This bridge is in worse condition than 80.6% of bridges in County 155. The average bridge in Kansas is 0 years old; this one is 62 years old.
Nearby Bridges
PARALLEL RD.31.50 over N. FORK NINNESCAH RIVER
Built 1988
PLEASANT VAL 30.80 over CROW CREEK
Built 1957
McNEW RD 9.30 over DRAIN
Built 1966
K-14 HWY over N. FORK NINNESCAH RIVER
Built 1996
Parallel Rd over STREAM
Built 1962
CASTLETON RD 31.60 over DRAIN
Built 1963
McNEW RD 6.60 over DRAIN
Built 1983
CASTLETON RD 33.20 over DRAIN
Built 2016
CASTLETON RD 30.80 over CROW CREEK
Built 1958
PARALLEL 34.10 over TRIB TO CHENEY RSRVR
Built 2017
Bridge Details
- Structure #
- 000780759105980
- Year Built
- 1964
- Length
- 9.8 m (32.2 ft)
- Max Span
- 4.6 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 2
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $300,000
- Total Project Cost
- $430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.