SYLVIA RD.5.20 over TRIB. TO SAND CREEK
1.0E 0.8S OF TURON · County 155, Kansas · Built 1956 · 2 Lanes · 21 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.794653, -98.410764
This bridge is in worse condition than 62.8% of bridges in County 155. The average bridge in Kansas is 0 years old; this one is 70 years old.
Nearby Bridges
Brownlee Rd over SAND CREEK TRIB
Built 1951
SH-61 GOLDEN DR over UNNAMED STREAM
Built 1958
RS 548 602250 over SAND CREEK TRIB
Built 1963
K61 HWY over SILVER CREEK DRAINAGE
Built 1947
OLCOTT RD.5.50 over SAND CREEK TRIB
Built 1974
PRETTY PR RD.6.40 over SAND CREEK
Built 1974
K61 HWY over WOLF CREEK
Built 1947
OLCOTT RD over SILVER CREEK
Built 2023
JORDAN SPR RD.7.20 over WOLF CREEK
Built 1954
MAPLE GROV RD.5.40 over SAND CREEK
Built 1965
Bridge Details
- Structure #
- 000780703006028
- Year Built
- 1956
- Length
- 12.2 m (40 ft)
- Max Span
- 5.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 21
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $270,000
- Total Project Cost
- $390,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.