SW 100 St over TURKEY CREEK

0.8S 6.8W OF COATS · County 151, Kansas · Built 1978 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000760643406440
Year Built
1978
Length
54.9 m (180.1 ft)
Max Span
18.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
40
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.