Victory Road over TRIB. MARAIS DES CYGNES
2.3S 2.8E OF PAOLA · County 121, Kansas · Built 2008 · 2 Lanes · 137 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
38.540869, -94.82655
This bridge is in worse condition than 35.5% of bridges in County 121. The average bridge in Kansas is 0 years old; this one is 18 years old.
Nearby Bridges
311th Street over TRIB. TO SOUTH WEA CREEK
Built 1954
311th Street over DORSEY BR. OF S. WEA
Built 1983
Hedge Lane Rd over BULL CREEK
Built 2020
335th Street over TRIB. MARAIS DES CYGNES
Built 2009
Baptiste Dr 1027 over Trib to South Wea Creek
Built 2003
Hospital Drive Rd over BIG BULL CREEK
Built 1976
US-169 HIGHWAY NB over RS-1021; BAPTISTE DR
Built 2002
RS1705 CENTENNIAL over US 169 K7 HWY
Built 1972
US169 K7 HWY SB over BAPTISTE DR K263 HWY
Built 1972
US-169 HIGHWAY NB over BULL CREEK
Built 2005
Bridge Details
- Structure #
- 000611091005005
- Year Built
- 2008
- Length
- 9.7 m (31.8 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 137
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.