MATIDOR (25.7-N.0) over TRIB NFB VERMILLION RIV.
7.0N 1.0E OF VLIETS · County 117, Kansas · Built 1945 · 1 Lanes · 10 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.813019, -96.319631
This bridge is in worse condition than 71.7% of bridges in County 117. The average bridge in Kansas is 0 years old; this one is 81 years old.
Nearby Bridges
27TH RD (26.0-N.5) over SWEET FORKS CREEK
Built 1993
LIMESTONE 25.5-M.0 over TRIB NFB VERMILLION RIV
Built 1940
RS 1229 26.2-O.0 over SWEETS FORK
Built 1966
27TH RD (26.0-O.1) over TRIB NFB VERMILLION RIV.
Built 2022
28TH RD (27.0-O.2) over TRIB NFB VERMILLION RIV.
Built 1999
28TH RD (27.0-L.4) over TRIB NFB VERMILLION RIV.
Built 1999
US36 HWY over N F BLK VERMILLION R DRN
Built 1958
28TH RD (27.0-O.8) over TRIB NFB VERMILLION RIV.
Built 1999
27TH RD (26.0-K.7) over TRIB NFB VERMILLION RIV.
Built 1999
OSAGE (27.2-P.0) over TRIB NFB VERMILLION RIV.
Built 1930
Bridge Details
- Structure #
- 000580927703260
- Year Built
- 1945
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.1 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $175,000
- Total Project Cost
- $280,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.